I have received a response from the council which they have asked me to publish on this blog relating to my concerns about the foundations that support the cliff façade, the base of which has recently been partly exposed by the contractor.
I have also received a response from the contractor via Laura Sandys MP, who is the MP for this constituency.
The two pictures above show the bottom of the concrete cliff façade support pillar marked with red dots and what appears to be virgin (undug) chalk below it.
The picture should get bigger if you click on it and even bigger if you click on it again.
This picture shows you where this is and I have drawn a red line around the area shown in the two first pictures.
This is a detail from the original design plans for the pillar supplied to me under foi legislation from the HSE, it is a side on view of the pillar.
As I can’t work out how the foundation was put beneath the virgin chalk, without digging it up and the front of the pillar doesn’t follow the line shown in the design drawing I have concerns about the integrity of this structure.
I discovered this situation last Saturday and asked Kent Fire and Rescue if they would examine it and close the footpath above it while more detailed investigations were made.
Kent Fire and Rescue investigated the area, confirmed that they couldn’t find and sign of foundations but told me that as the council had told them that the cliff was safe, they were not able to close the footpath.
"REGENERATION SERVICES
Michael.child@aol.com
15 April 2011
Our ref: BJW/BH
Your ref:
Dear Mr. Child
‘PLEASURAMA’ CLIFFSIDE, RAMSGATE
I am writing in response to your interest regarding the cliff wall to the rear of the Royal Sands
(formerly ‘Pleasurama’ site at Ramsgate. Your concern being that the cliff wall has no proper
foundations, and is therefore at risk. A site visit was made on Monday 11 April by Mr. Mike Humber,
the Council’s Engineer and myself. The ground has been excavated adjacent to the cliff wall in
recent weeks to enable work on the foundations to the Royal Sands development to proceed.
Consequently chalk is visible in places at a level beneath the cliff wall façade, and this has led you to
believe that there may be no foundations supporting the cliff wall itself.
However the point that you have missed on your inspections is that there are substantial concrete
foundations, to a minimum depth of two metres, beneath each of the main supporting columns to the
cliff wall. This was verified during our site inspection.
Records exist of the design of the original cliff wall dating from the early part of the 20th century in the
form of a construction drawing and I believe you already have a copy of this. The observations made
on site this week confirm that the foundation provision appears to be as described on the drawing. It
can be seen that the foundations and columns were both cast insitu with the columns exhibiting a
regular finish from timber formwork whilst the foundations were cast against the hand excavated face
of bare virgin chalk. I suggest that it is this interface between these two very different concrete
finishes that you have misinterpreted as the base of the concrete structure. Although recessed a
little, the foundation does continue well below this elevation as confirmed above.
I do trust that this letter draws your concern to a satisfactory conclusion. Thank you for your interest
in the subject. Perhaps you might post a copy of this letter on your blog.
Whilst writing, because of your interest also in the engineering history of Ramsgate Harbour I thought
I would draw your attention to the pending completion of a new floating concrete breakwater in the
Outer Harbour area. This is the single biggest investment the Council has made in the Harbour for
some 20 or so years. The new floating breakwater will not only protect the Eastern Marina, it will also
provide satisfactory berthing for work boats used in the construction and ongoing operation of the
London Array offshore windfarm. The Council is very pleased with the new structure, a large portion
of the funding was provided through European Union grant.
Yours sincerely
B White
Director of Regeneration Services
Email: brian.white@thanet.gov.uk
Tel: 01843 577007
cc. Cheryl Pendry
Mike Humber"Below is my response to them
"Dear Brian and Mike.
I have to admit the saga of this cliff wall is a bit of a difficult one, but as the wretched thing doesn’t conform to the design drawings I feel it best to err on the safe side. Most particularly as the previous two problems I reported to the council, the bulging panel and the 1860s balustrade both resulted in council action to repair the problem.
God alone knows how that 1860s balustrade is supposed to work, if it has foundations and how much water is getting in from behind. Did you know that when the railway extension from Herne Bay to Ramsgate was put in, in the 1860s the government inspector, Captain Rich condemned much of the civil engineering work including several of the bridges, which had to be rebuilt?
I am still concerned that I haven’t got any evidence that there is sound concrete all the way between the bottom of the visible concrete pier and the rough cast concrete that you have discovered at the at the bottom of the recent excavation.
Have you either exposed continuous concrete between the bottom of the pier and the bottom of the excavation, carried out a driven rod or bore test this in this area?
The reason I ask this is that the chalk at the bottom of the pillar doesn’t have the appearance of made ground and I can’t see how the back of a load spreading foundation or the bottom of the pillar could have been constructed without disturbing the chalk.
As we have discussed before the façade isn’t a load bearing structure and I am particularly concerned that heavy vehicles are accessing the cliff edge while below excavations are being made of foundations that don’t conform to exactly the design drawings i.e a uniformly cast liner pillar extending down to the foundations.
After the arched part of the façade (visibly the most sound and professionally constructed part) the contractor will presumably excavate in front the less linier portal part of the façade where both the pinning took place and the contractor has already discovered and documented one pillar with inadequate foundations sitting on made ground.
In short the risks of a normal building site appear to have been adequately addressed apart from the added problem of the proximity of the public footpath to the edge of the cliff.
I am not asking that this be permanently closed while the building work is in progress, something would I think be unnecessary and damaging to the town’s economy.
Just that the parts above excavation of any part of the base of the façade that doesn’t conform precisely to the design drawings is closed while investigations are made and of course some emergency signage warning people not to drive anywhere near the cliff edge.
Best regards Michael"
I have also had a response from Laura Sandys informing me that the contractor, Cardy Construction will “further expose a section of the foundation and provide Michael with photographic evidence of the existing foundation,”
I have added a link to a series of linked webpages showing some of the various technical reports on the cliff façade structure http://www.thanetonline.com/cliff
I have added a link to a series of linked webpages showing some of the various technical reports on the cliff façade structure http://www.thanetonline.com/cliff